Blog / How much does a house design cost in Bosnia in 2026

How much does a house design cost in Bosnia in 2026

What a house design fee covers, how the concept and the main design differ, and orientation prices for a house of 150 to 300 square metres.

· 5 min readcijeneprojektovanjekuća
House plans, a ruler and a mug on a desk

The first question almost every client asks is: how much does a house design cost? The honest answer starts with what the design actually includes. Here is how we count, and the figures you can expect.

What the fee covers

A house design is not one drawing but a set of documents required by the municipality, the builder and you:

  • Concept design: layout, floor plans, facades, 3D views. This is what you apply for planning consent with.
  • Main design: architecture, structure, electrical and mechanical installations, water and drainage, reports (energy, fire protection). This is what the building permit is issued on.
  • Construction details: shop drawings, joinery schedules, facade and roof details, material specifications.
  • Bill of quantities: the basis for contractor offers and cost control.

When you compare offers, check which of these items are included. The cheapest offer often covers only the architecture, with the other disciplines charged afterwards.

Orientation prices

For a family house of 150 to 300 m² in Bosnia and Herzegovina, in 2026, it is realistic to count on:

PhaseOrientation price
Concept design8 to 15 KM/m²
Main design (all disciplines)25 to 45 KM/m²
Construction details and interiorsby scope, usually 20 to 40 % of the main design

In total, a complete design for a 200 m² house ranges from 7,000 to 14,000 KM, depending on the terrain, the structure and the level of detail. For comparison, that is usually 2 to 4 % of the total construction value.

What raises and what lowers the price

Steep terrain and retaining walls, a basement, large glazed areas, a complex roof and several facade materials raise the price. A clear wish list at the start, simple geometry and decisions made at the right time rather than on site lower it.

Why the design pays for itself

On every house we have worked on, the most expensive mistakes happened where there were no drawings: installations in the wrong place, windows that did not fit the openings, material ordered twice. A good design removes those mistakes before they cost anything.

If you are planning a house, send us the location, the rough floor area and a short description. You get an offer with an exact price within one working day.

Related articles

All articles

Have a question about your project?

Send us the basics. We reply within one working day.

Send an inquiry
Just have a question? Message us onWhatsAppViber
How much does a house design cost in Bosnia in 2026 · Archordion